Robbin Installation Team

Covering the M4 Corridor and South West England our direct employed 20 man installation team, based from the Keynsham Factory, are able to undertake any size of project from Reading to Swansea, Birmingham to Plymouth.

The Robbin Installation Team consists of 9 fully equipped vehicles each manned by two qulaified and certified installers of both Architectural Metalwork and Structural Steelwork. Each site team is run by a CSCS qualified Supervisor with a dedicated SMTS Installation Manager responsible for all Job Specific RAMS (Risk Assessment and Method Statement) , programming and project co-ordination.

Our sites are monitored and audited by the Building Safety Group to ensure adherence to our target of providing an injury free environment for all our employees, fellow trades and members of the public. A robust commitment to training via the CITB training programme ensures you can always guarantee the highest of safety standards.

Boasting a tracked fleet of 7 Mercedes Sprinters, 3 Peugeots, 2 Vitos and a 7.5te Iveco Cargo our capacity to place materials and labour anywhere in the South West is unsurpassed.

Aswell as a vast pool of installation experience, the Robbin Installation Team have forged close links with our long established supply chain delivering the best in Transport, Cranes, Access, Tools and Specialised Lifting (see the supply chain link on the menu) ensuring your project will be safely delivered on time and on budget.